This TACFI will prepare the K2 Space Mega Class bus to integrate DAF payloads into the first orbital mission, scheduled for early FY26, by completing the required interface design criteria reviews; building and demonstrating a payload hardware-in-the-loop (HITL) simulator and conducting an integration readiness review (IRR)
